HOME
introduction
the measure of all things
perfect concept
precast procedure
installation instructions
ingenious details
Bell Instructions
w/ GU PIPE BELL
Bell Instructions
w/ GU BOOT HUB
application options
Manhole 48"
shallow manhole 48"
shallow manhole 24"
specification
testing method
procedures for ordering
order sheet
 
print view
 
back to products
 
english deutsch espanol
   
 

INSTALLATION INSTRUCTIONS
for GU Manhole Base Liner

03/09  

GU recommends installing pipe stubs at all pipeline connections regardless of pipe type. When used in
conjunction with the GU bell and gasket, pipe stubs assure an additional tension-free, flexible
connection lessening various settlement phenomena.

After installation of the manhole base section

Visually inspect to ensure that the gasket has not been dislodged. Check flow through the channel.
Test manhole structure as specified.


Download Instructions in pdf format